SSS Documents
Cold Test Methods
|
Powering Methods
|
Instrumentation, Insulation & MM Methods
|
Preparation & Miscellaneous Methods
|
Seq.
|
Method
|
Prepared By
|
Seq.
|
Method
|
Prepared By
|
Seq.
|
Method
|
Prepared By
|
PT4 |
Slow Power Abort |
S.Sridhar,
K.P.K. Nair |
Prep 2.2,
PT 1
PT 13.1 |
Instrument
Analysis Procedure |
S.Sridhar,
K.P.K. Nair |
Prep 1 |
Lyre Test |
P. Pareek, R. Narayanan |
Prep2.2.c |
VClamp test connection |
A. Kasbekar |
PT5.2 |
Provoked Quench 1/2 HF at 1500 A |
S.Sridhar,
K.P.K. Nair |
BEF 3,
Prep 3,
PT2
PT9
PT13.3 |
HV Test |
S.Sridhar |
BEF 3, Prep 2.3,
PT 3, PT13.2 |
Resistance measurment for SSS |
K.P.K Nair |
PT5.3
...
PT5.6 |
Powering of correctors |
P. Surendran |
MM1 |
MM positioning at
760A |
J. K. Mishra, M.
Mascarenhas |
|
|
|
MM2 |
LHC Cycle |
J. K. Mishra |
MM3 |
Full Load Line |
J. K. Mishra |
MM4 |
Correcror Magnets |
J. K. Mishra |
PT6 |
Training Quenches |
|
SW, SC |
SSW |
K.P.K. Nair |
|
|
|
PT8 |
De-training and Fast
De-excitation test |
E. Veyrunes |
Chaconsa |
Magnetic
Measurement using Chaconsa |
K.P.K. Nair |
|
|
|
PT7.1 |
Provoked Quench 1/2 HF at 6000 A |
S.Sridhar,
K.P.K. Nair |
SW, SC, Survey |
SSW/Survey |
G. Deferne |
|
|
|
PT10 |
Provoked Quench 1/2 HF at 11850 A |
S.Sridhar,
K.P.K. Nair |
SW, SC, Survey |
SSW/Survey |
G. Deferne |
|
|
|
Warm Test Methods
|
Method |
Prepared by |
SSS AC Mole Measurement
|
Palanisami Kuppusamy |
Dipole / Quadrupole shaft calibration |
Sasidhar Rao Boyidi, I. Vadillo |
|
|
|
|
|
User Guides
|
Guide
|
Prepared by
|
SM18 made easy |
A. Naushad |
MTF Upload Guide |
S.Sridhar, M.
Mascarenhas |
Global Architecture of the security system for SMTP |
GHH (Translated
by), P. Legrand (Original by) |
Manual for
Magnet Equipment Scan |
A. Bouchenoua,
M.Gateau |
Manual for PLC
Central Unit |
E. Veyrunes |
Manual for
TEMA Software |
E. Gorskaia, T.S.Selvakumaran |
NC (Nonconformity) procedure |
J. K. Mishra |
Check List : SMTMS, MTF, CDR, e-Traveller |
D.
A. Roy |
|
|