Following are the main points discussed in today's meeting (Tuesday, 14th March 2006):

Test Coordinator : Vittorio

Equipment Support : R. Mompo

Total complete magnet tests : 18

Dipoles : 9 (2 with MM, both repeat)

ARC-SSS : 6

IR-SSS : 3

. Guy informed that the problem on TBD1 regarding launching stretch wire test is fixed.

. SSS611 will come on TBD2 on 14.3.06.

. Guy emphasized for arranging practical training for stretch wire tests for new indian colleagues.

. Vinod Chohan pointed out that in control room, the 2 PCs labeled / marked as "For op data management", should not be used for personal / private use.

. ICS will work in one shift instead of two, due to DFB related work.

. Leak in magnet MBAR2247, which caused HV failure at warm, is repaired.

. Leak found at cold in TBC2 SSS237. Magnet removed on Friday and on standby.

. Siemko told that the nonconfirmity should be opened by the group responsible to the respective tests.

. Siemko told that further investigation is required on TBB1 for sss038. It may take one more day.

. On TBE2, HV test problems due to magnet connector C10 mismatch with HV rack. Siemko told that non confirmity should be opened in case of the problem is in magnet side connector.

. Due to changes in MTF, problems reported in Easy MTF link.

. On TBF1, during AQA analysis, current bump not detected by AQA. Giorgio informed that with new release of software, the AQA problems will be solved.

. On TBC1, LF files not present during AQA analysis (during 2nd training quench analysis). Giorgio informed that the solution could be found in new release of software.

With warm regards,

Charudatta Kulkarni...