Minutes of Meeting on Tuesday, September 12, 2006 at 9:00 Hrs. in SM-18

1. 17- magnets were tested this week (9-Dipoles, 6-Arc.SSS, 1-500seriesS4 and 1-600series S4).

2. This week Supervisor –Vittorio, Eq. Support-Federico (163602)

3. Magnet 608 was repeated because of Quench heater problem.

4. Op team informed that there is a Voltage tap problem on F1 bench which Eq. Support is looking after.

5. On A2 bench on Magnet 1338, MCO corrector resistance measurement was not OK and hence NC was generated.

6. In B cluster (Both B1 &B2) there is a cryo problem due to high heat loss. As a result there is deficiency of pressure and flow does not remain stable for long time. This is leading to quenches in VClamp. So quenches on this cluster are to be done quickly after flow stabilizes on cryo-ok.

7. Next 600 series magnet to come on D cluster is 673.

8. 1 arc SSS will come today on which MM is to be done.

9. Magnet 329 has to be signed for Stand-By due to cryo-leak problem.

That’s all in today meeting. Have a good day.

M.Y.Dixit